| |
Fossil News
September 15, 2002
Fossil Power Systems Inc. (FPS) is pleased to announce that we
have been awarded the DCS Controls, Instrumentation and Valve
Skids portion of the CFB Greenwood New Steam Plant project in
Greenwood, Nova Scotia.
Our partner, Le Groupe Simoneau of Montreal, Quebec,
will be providing three Thermodesign manufactured 35,000 PPH Package
Boilers. Fossil will be engineering the Siemens-Moore APACS+ DCS
hardware platform for the complete boiler and burner controls,
which will be running the FPS Graphical based HMI. Our dual fuel
FPS ignitors and flame scanners, as well as the FPS designed and
manufactured Fuel/Valve Skids and Heating/Pumping Skid are also
included.
CFB Greenwood is expecting to commission the system
by January 2003.
|
|